background image

Form # 20070310

•  

Assemble the frame as shown in the diagram by performing the following steps in order:

1.  Assemble the perimeter first by inserting the poles in sequence.   Note: When assembling the 

     

perimeter on the final side, the male/female connection in the middle should be the final 

     

     

connection of the side.

2.  Connect the rafters to the cluster.  Note: Connect corner rafters to cluster first (shorter tube on 

     

the cluster)

3.  Install the ridge poles and intermediate roof rafter brackets.  Note:  It may be necessary to push 

     

outward on the intermediate rafter to get it to seat in the roof rafter bracket.

•  

Take the top from the bag and lay it over the frame.

•  

Raise the frame and insert the legs into the brackets making sure the snap button is engaged in the hole of              

      

the bracket.

•  

Attach the vinyl top to the frame with the side release buckles along the perimeter.

•  

Raise the tent to the desired height with the adjustable bases - if so equipped.

•  

Outguy as needed.

 

 
 

 

           

 
 

 

Installation Instructions

SFD-2030

C

A

A

A

A

A

A

B

D

D

C

D

D

D

C

D

C

D

D

D

D

C

C

C

C

B

C

C

B

C

C

A

A

A

B

B

C

B

C

B

C

C

B

C

B

C

B

D

C

C

D

D

A

E

Summary of Contents for Standard Frame Deluxe 20 x 30

Page 1: ...Frame Deluxe 20 x 30 Form 20070309 Installation Instructions SFD 2030 TopTec Products LLC 7601 Highway 221 Moore SC 29369 Phone 800 845 2830 Fax 800 921 7750 email sales toptecproducts com www toptecproducts com ...

Page 2: ...d intermediate roof rafter brackets Note It may be necessary to push outward on the intermediate rafter to get it to seat in the roof rafter bracket Take the top from the bag and lay it over the frame Raise the frame and insert the legs into the brackets making sure the snap button is engaged in the hole of the bracket Attach the vinyl top to the frame with the side release buckles along the perim...

Page 3: ...s The installer is responsible for properly securing the temporary structure tent Soil conditions will vary and the wind loads that the temporary structure can handle could be significantly below its wind load capabilities Holding power is based on firm soil conditions If other conditions prevail the holding power will decrease and alternate anchoring methods are required Installed Tent Inspection...

Page 4: ... X 58 Male Female Single Snap Button E POLE 1 75 OD X 62 Male Male Double Snap Button Installation Instructions Corner Bracket SFD 2030 Intermediate Bracket Crown Cluster Tent Number of Number of Number of Leg Leg Square Size Legs Ropes or Stakes Spacing Height Feet Straps 20x30 10 10 10 10 7 600 C A A A A A A B D D C D D D C D C D D D D C C C C B C C B C C A A A B B C B C B C C B C B C B D C C D ...

Reviews: