INSTALLATION PROCEDURE
STEP 1:
After unloading the lift, place it near the intended
installation location.
STEP 2:
Remove the shipping bands and packing materials from the
lift. The power unit will be unpacked from the top. Note: Be care-ful
not to drop power unit on heavy end
STEP 3:
Open the wrapping, remove the parts and parts boxes from
the packaging. Unbolt the structure from the shipping brackets. (Use
proper lifting devices, cranes or a forklift to lift off of shipping
brackets.)
STEP 4:
Slide each carriage 60-70" towards top of columns to
expose base of cylinders. Open the oil port of each cylinder by
unscrewing the black plastic cap. The oil port will face the backside
of the column and the notch on the bottom of the cylinder will fit
into the hole in the center of the base plate. (Fig 3)
STEP 5
: Install the hydraulic fittings on the
Cylinders inside the columns. DO NOT remove the stop plug from the non-power side column
cylinder.
NOTE: Use Teflon Tape on Pipe fitting connect to cylinder port
.
(Fig. 4, 5, 6, 7)
Fig 3
Fig 4
Fig 5
Fig 6
Fig 7