6
ASSEMBLY
SYSTEM AIR PURGE PROCEDURE
1. Familiarize yourself with the jack.
2. Attach the 3 handle pieces making sure to align
the holes on both sections.
3. Line up the handle to the handle socket located
on the side of the jack, then insert the handle
inside the handle socket.
4. Secure the handle in place inside the handle
socket. Without any vehicle on the jack. Cycle
the lift up and down several times to insure the
hydraulic system is operating properly. (Perform
to the Air Purge Procedure before first use.)
1. Turn release valve counterclockwise on full turn to
the open position.
FIGURE 1 - Typical Bottle Jack
Ram
Saddle
Release
Valve
Handle
Sleeve
Handle
Assembly
Oil Plug
(on reservior)
IMPORTANT: BEFORE FIRST USE
Perform the following Air Purge Procedure to
remove any air that may have been introduced into
the hydraulic system as a result of product shipment
and handling. This step is to be completed without
any weight on the jack.
Summary of Contents for T93007
Page 12: ...12 ASSEMBLY DIAGRAM...
Page 27: ...27 SCH MA DE MONTAGE...
Page 42: ...42 DIAGRAMA DE ENSAMBLAJE...