Setup
Loose Parts
Use the chart below to verify that all parts have been shipped.
Procedure
Description
Qty.
Use
Handle assembly
1
Bolts
4
Belleville washers
4
1
Flange nut
1
Install the handle.
Speed selector rod
1
Cotter pin
1
2
Flat washer
1
Install the speed selector rod.
3
Flange locknut
1
Install the traction rod.
Clevis pin
1
4
Cotter pin
1
Install the auger/impeller drive control
linkage.
Chute control rod assembly (rod and
bracket, worm gear, and bracket)
1
Belleville washer
1
Bolt
2
Carriage bolt
1
Locknut
3
5
Curved washer
1
Install the chute control rod.
6
No parts required
–
Fill the engine with oil.
7
No parts required
–
Check the tire pressure.
8
No parts required
–
Check the skids and scraper.
8