Setup
Loose Parts
Use the chart below to verify that all parts have been shipped.
Procedure
Description
Qty.
Use
1
No parts required
–
Check the boom hinge springs.
2
No parts required
–
Remove the shipping bumper.
Media and Additional Parts
Description
Qty.
Use
Starter key
2
Operator's Manual
1
Engine owner's Manual
1
Parts Catalog
1
Operator Training Materials
1
Read the manuals and watch the training materials before
operating the machine.
Note:
Determine the left and right sides of the machine from the normal operating position.
Note:
If you have questions or need additional information regarding the spray control system, refer to the
Operator’s Manual
supplied with the system.
Important:
This sprayer is sold without nozzles and a application-rate controller. Either a
Manual Spray Operation
Kit or ProControl
™
™
™
XPKit is necessary for the proper function of the machine.
To use the sprayer,
you must obtain and install nozzles. Contact your Authorized Toro Distributor for information
on the available boom kit and accessories.
After you install your nozzles and before using the sprayer for the first time (if you
do not use Pro Control
™
™
™
XP Spray
System), adjust the boom bypass valves so that the pressure and application rate remains the same for all booms
when you turn one or more booms off. Refer to Calibrating the Boom Bypass Valves section in the Operation section.
1
Checking the Boom Hinge
Springs
No Parts Required
Procedure
Important:
Operating the spray system with the boom
hinge springs under the incorrect compression could
damage the boom assembly. Measure the springs and
use the jam nut to compress the springs to 3.96 cm (1.56
inches), if necessary.
The sprayer is shipped with the boom extensions swung
forward to facilitate packaging of the machine. The springs
are not fully tightened at the time of manufacture to allow the
booms to be in this position for transit. Before operating the
machine, adjust the springs to the correct compression.
1.
If necessary, remove the packing components that
secure the right and left extension booms during
shipping.
2.
Support the booms while they are extended to the
spray position.
3.
At the boom hinge, measure the compression of the
upper and lower springs while the booms are in their
extended position (
A.
Compress all springs until they measure 3.96 cm
(1.56 inches).
B.
Use the jam nut to compress any spring that
measure greater than 3.96 cm (1.56 inches).
14