Installation
7
8.
Release the latch levers and push carrier frame
down. Latch pins should lock.
9.
Select hole in mower hanger bracket
corresponding to the height-of-cut desired. Lift
on side and front handles to align holes and
insert clevis pin (Fig. 8).
10. Secure clevis pin with hairpin cotter (Fig. 8).
Note:
All four clevis pins should be in the
same hole location for a level cut.
1
m-3532
3
2
Figure 8
1.
Mower Hanger Bracket
2.
Clevis Pin
3.
Hairpin Cotter
11. Secure PTO cover down with 5/16–18 x 7/8”
(11 mm) shoulder bolt and 5/16” flange nut
(Fig. 9).
2
m-3718
3
1
Figure 9
1.
PTO cover
2.
Shoulder bolt
5/16–18 x 7/8” (11 mm)
3.
Flange nut 5/16”
Removing the Mower
1.
Remove 5/16–18 x 7/8” (11 mm) shoulder bolt
and 5/16” flange nut holding PTO cover down
(Fig. 9).
2.
Drive roll pin through hole in universal joint to
remove PTO drive shaft from gearbox shaft
(Fig. 7).
Note:
Roll pin and drive shaft remain with
traction unit.
1
2
4
m-3376
3
Figure 10
1.
PTO Driveshaft
2.
Universal Joint
3.
Gearbox shaft
4.
Roll Pin