g246472
Figure 25
1.
Chute
3.
Retaining clasp (welded to
the mower deck)
2.
Flexible latch
6.
Rotate the latch until it hooks into the hole in the
mower deck stiffener (
g017842
Figure 26
1.
Latch
2.
Hole in the mower deck
stiffener
7
Connecting with the
Discharge Tube
Parts needed for this procedure:
1
Discharge tube
Procedure
1.
Slide the curved end of the discharge tube into
the opening in the bagger top (
g010641
Figure 27
1.
Discharge tube
4.
Peg
2.
Opening in bagger top
5.
Rubber strap
3.
Flared end of the
discharge tube
2.
Slide the flared end of the discharge tube over
the end of the chute. Move the rubber retaining
strap on the chute snaps over the peg on the
discharge tube to secure it (
3.
After the bagger installation, install the wire onto
the spark plug(s).
14
Summary of Contents for 79398
Page 20: ......