g300378
Figure 16
5.
Lower the bagger top onto the bags (
g033030
Figure 17
6.
Install the upper bagger tube by inserting the
curved end into the opening in the bagger top.
Note:
Ensure that the flared end with the
retention post is pointing down and froward in
preparation to be mated with the Finishing Kit.
9
Installing the Chute
Parts needed for this procedure:
1
Chute
1
Baffle (50-inch decks only)
Procedure
For 54-inch decks, go to Step 3.
1.
For 50-inch decks, remove the existing baffle
from the machine (
).
g299303
Figure 18
2.
Install the new small baffle to the mower deck
at the same location in the mower deck as the
previously removed baffle (
11
Summary of Contents for 79412
Page 20: ......