Setup
Loose Parts
Use the chart below to verify that all parts have been shipped.
Procedure
Description
Qty.
Use
1
No parts required
–
Prepare the machine.
2
E-Z Vac Blower and Drive Kit (sold
separately)
1
Install the E-Z Vac Blower and Drive Kit
(sold separately).
Blower assembly (from the Blower and
Drive Kit)
1
Belt (from the Blower and Drive Kit)
1
Belt cover (from the Blower and Drive
Kit)
1
3
Knob (from the Blower and Drive Kit)
1
Install the blower assembly, belt, and
belt cover.
Front mount bracket
1
Lower mount bracket
1
Rear mount bracket
1
Right mount bracket
1
Flat washer
2
Bolt (3/8 x 4 inches)
2
Carriage bolt (3/8 x 1 inch)
1
Nut (3/8 inch)
1
Carriage bolt (1/4 x 5/8 inch)
2
4
Nut (1/4 inch)
2
Install the brackets.
Bagger-frame assembly
1
Clevis pin
2
Hairpin cotter
3
Thrust washer
1
Nut (3/8 inch)
1
5
Carriage bolt (3/8 x 1 inch)
1
Install the bagger frame.
6
Bag
2
Install the bags.
Tube
1
Hose clamp
1
7
Blower clamp
2
Install the bagger tube.
Weight
1
U-bolt
1
Long U-bolt (for Multi ForceTM
machines with 52-inch decks only)
1
8
Locknut (1/2 inch)
2
Install the weight.
Note:
Determine the left and right sides of the machine from the normal operating position.
6