Removing the Roof Assembly
1. Park the machine on a level surface, lower the cutting deck, shut off the
engine, set the parking brake, and remove the key from the key switch.
2. Remove the 16 washer-head screws (item 1 in
) that secure the
roof cover, cover seals, and roof straps to the roof.
3. Remove the 22 shoulder screws (item 5 in
), 22 flat washers, and
22 flange nuts that secure the roof and cab straps to the headliner.
4. Carefully lift the roof from the headliner and cab.
5. Inspect all the roof seals for wear or damage. Replace the roof seals as
necessary.
Installing the Roof Assembly
1. Ensure that all the components in the headliner are installed and secure.
2. Position the roof onto the headliner. Ensure that all the roof mounting holes
are correctly aligned with the headliner.
3. Secure the roof to the headliner with the 22 shoulder screws (item 5 in
), 22 flat washers, cab straps, and 22 flange nuts that were removed.
4. Secure the roof cover, cover seals, and roof straps to the roof with the 16
washer-head screws that were removed.
Operator Cab: Service and Repairs
Page 11–4
Groundsmaster
®
3280-D/3320
05138SL Rev B
Summary of Contents for Groundsmaster 3280-D
Page 4: ...NOTES Revision History Page 4 Groundsmaster 3280 D 3320 05138SL Rev B ...
Page 10: ...Preface Page 10 Groundsmaster 3280 D 3320 05138SL Rev B ...
Page 56: ...Gasoline Engine Service and Repairs Page 3 22 Groundsmaster 3280 D 3320 05138SL Rev B ...
Page 84: ...Diesel Engine Service and Repairs Page 4 28 Groundsmaster 3280 D 3320 05138SL Rev B ...
Page 228: ...Hydraulic System Service and Repairs Page 5 144 Groundsmaster 3280 D 3320 05138SL Rev B ...
Page 430: ...PTO System Service and Repairs Page 9 12 Groundsmaster 3280 D 3320 05138SL Rev B ...
Page 466: ...Operator Cab Service and Repairs Page 11 16 Groundsmaster 3280 D 3320 05138SL Rev B ...
Page 470: ...Foldout Drawings Page A 4 Groundsmaster 3280 D 3320 05138SL Rev B ...
Page 508: ......