g002014
Figure 64
Right Boom
1.
Grease fitting
3.
Wipe off excess grease.
4.
Repeat the procedure for each boom pivot.
Greasing the Actuator-Rod
Bearings
Service Interval:
Every 400 hours/Yearly (whichever
comes first)
Grease Type:
No. 2 lithium grease.
1.
Extend the booms to the S
PRAY
position.
2.
Remove the cotter pin from the pivot pin (
3.
Lift up on the boom, remove the pin (
),
and slowly lower the boom to the ground.
4.
Inspect the pin for any damage, replace if
necessary.
g013780
Figure 65
1.
Actuator
4.
Cotter
2.
Actuator rod
5.
Pin
3.
Boom-pivot-pin housing
5.
Manipulate the actuator-rod-bearing end and
apply grease into the bearing (
Note:
Wipe off excess grease.
g002015
Figure 66
Right Boom
1.
Grease bearing
6.
Lift up on the boom to align the pivot with the
actuator rod.
7.
While holding the boom, insert the pin through
the boom pivot and actuator rod (
8.
With the pin in place, release the boom
and secure the pin with the cotter removed
previously.
53
Summary of Contents for Multi Pro 5800-D
Page 74: ...Spray System Schematic g034336 Figure 95 74 ...
Page 89: ...Notes ...
Page 90: ...Notes ...