1
Test Hook-up No. 3: Charge Pressure and Implement Relief Pressure (Fig. 20)
Gauge Connection
Connect a 1000 PSI hydraulic pressure gauge to charge
pressure gauge port.
TEST A: Charge Pressure
1. Make sure hydraulic oil is at operating temperature.
2. Operate engine at full speed:
Reelmaster 216:
3600
±
100 RPM
Reelmaster 216-D:
3200
±
100 RPM
3. Traction pedal and lift valve in neutral. Parking brake
engaged.
TESTER READINGS: 70 – 150 PSI.
TEST B: Implement Relief Pressure
1. Make sure hydraulic oil is at operating temperature.
2. Operate engine at full speed:
Reelmaster 216:
3600
±
100 RPM
Figure 20
Reelmaster 216-D:
3200
±
100 RPM
1. 1000 PSI hydraulic pressure gauge
3. Traction pedal in neutral and parking brake engaged.
4. Pull lift valve lever to raise cutting units and hold lever
so systems goes over relief.
TESTER READINGS: 700 – 800 PSI.
Implement relief pressure should not exceed
800 PSI.
CAUTION
NOTE: If pressure is within specification but the cutting
units do not lift or lift slowly, check for mechanical
binding, or internal leakage of lift cylinder.
Reelmaster
®
216/216-D
Page 5 - 21
Testing
Summary of Contents for reelmaster 216
Page 2: ...This page is blank ...
Page 4: ...This page is blank ...
Page 8: ...Safety Instructions Page 1 4 Reelmaster 216 216 D ...
Page 12: ...Torque Specifications Page 2 4 Rev B Reelmaster 216 216 D ...
Page 26: ...Adjustments Page 4 4 Reelmaster 216 216 D ...
Page 40: ...Troubleshooting Page 5 14 Reelmaster 216 216 D ...
Page 42: ...Troubleshooting Page 5 16 Reelmaster 216 216 D ...
Page 72: ...Repairs Page 5 46 Reelmaster 216 216 D ...
Page 75: ...Reelmaster 216 S N 10001 19999 Reelmaster 216 216 D Page 6 3 Wiring Schematics ...
Page 76: ...Reelmaster 216 S N 20001 Up Wiring Schematics Page 6 4 Reelmaster 216 216 D ...
Page 77: ...Reelmaster 216 D Reelmaster 216 216 D Page 6 5 Wiring Schematics ...
Page 114: ...Repairs Page 7 8 Reelmaster 216 216 D ...
Page 124: ...Repairs Page 8 10 Reelmaster 216 216 D ...
Page 143: ...This page is blank ...