Figure 32
Rear axle
1.
Grease fitting (upper pivot)
2.
Grease fitting (lower pivot)
3.
Wipe up any excess grease.
Greasing the Driveshaft
Service Interval:
Every 500 hours
1.
Clean the grease fittings with a rag.
2.
Connect the grease gun to the grease fitting for the
slide coupling at the at the forward end of the drive
shaft, and apply 2 or 3 pumps of grease to the fitting
(Figure 33).
Figure 33
1.
Grease fitting (forward
universal joint)
3.
Grease fitting (back
universal joint)
2.
Grease fitting (sliding joint)
3.
Connect the grease gun to the grease fitting for the
universal joint at the forward end of the drive shaft,
and apply 2 or 3 pumps of grease to the fitting.
4.
Connect the grease gun to the grease fitting for the
universal joint at the back end of the drive shaft, and
apply 2 or 3 pumps of grease to the fitting.
5.
Wipe up any excess grease.
Greasing the Backfill Blade
Service Interval:
Before each use or daily
1.
Clean the grease fittings with a rag.
2.
Connect the grease gun to the upper and lower grease
fittings for the lift cylinder, and apply 3 pumps of
grease to each fitting (Figure 34).
35
Summary of Contents for RT600
Page 71: ...Notes 71...