Setup
Loose Parts
Use the chart below to verify that all parts have been shipped.
Procedure
Description
Qty.
Use
Steering wheel
1
1
Roll pin (1/4 x 2 inch)
1
Install the steering wheel.
2
Bulk electrolyte, 1.260 specific gravity
(not included)
-
Activate and charge the battery.
Bolt (5/8 inch)
2
3
Locknut (5/8 inch)
2
Install the battery
4
Refuse container
1
Install the refuse container
Media and Additional Parts
Description
Qty.
Use
Capscrew (1/2 x 1–1/4 inch)
4
Washer (1/2 inch)
4
Cylinder pin
1
Cotter pin
2
Operator’s Manual
1
Engine Operator’s Manual
1
Parts Catalog
1
Operator Training Materials
1
Key
2
Certificate of Compliance
1
Read the manuals and view the training materials before
operating the machine. Use the remaining parts for the
installation of attachments.
Note:
Determine the left and right sides of the machine from the normal operating position.
Note:
Remove and discard all the shipping brackets and fasteners.
9
Summary of Contents for Sand Pro 2020
Page 33: ...Schematics Electrical Schematic Rev A 33 ...
Page 34: ...Hydraulic Schematic Rev C 34 ...
Page 35: ...Notes 35 ...