Deck Lift Assembly 3 Point Installation (continued)
g301964
Figure 206
20. Raise the deck to add tension to the lift handle. Remove the wood blocks
(2x4) under each side of the deck.
Deck Lift Assembly 4 Point Replacement
Deck Lift Assembly 4 Point Removal
1. Park the machine on a level surface and set the parking brake. Stop the
engine, wait for all moving parts to stop and remove the key.
2. Place wood blocks (2x4) under each side of the deck.
3. To relieve tension on the height-of-cut pin, depress the foot lift handle and
remove the height-of-cut pin from the height-of-cut gate.
4. Lower the deck onto the wood blocks.
5. Remove the LH 4 (3/8 inch) bolts securing the belt cover to the deck.
6. Using a spring puller, remove the deck tension spring from the deck tension
spring anchor.
7. Remove the deck belt from the PTO clutch.
8. Remove the 2 (1/2 inch) bolts and 2 (9/16 inch) nuts securing the rear trailing
arm to the deck.
TIMECUTTER® Service Manual
Page 5–95
Chassis: Service and Repairs
3433-938 Rev A
Summary of Contents for TIME CUTTER ZS 4200S
Page 2: ...Revision History Revision History Page 2 TIMECUTTER Service Manual 3433 938 Rev A ...
Page 6: ...Preface Page 6 TIMECUTTER Service Manual 3433 938 Rev A ...
Page 26: ...Troubleshooting General Troubleshooting Page 3 6 TIMECUTTER Service Manual 3433 938 Rev A ...
Page 50: ...Engine Service and Repairs Page 4 24 TIMECUTTER Service Manual 3433 938 Rev A ...
Page 154: ...Chassis Service and Repairs Page 5 104 TIMECUTTER Service Manual 3433 938 Rev A ...
Page 188: ...Mower Deck System Service and Repairs Page 7 16 TIMECUTTER Service Manual 3433 938 Rev A ...
Page 212: ...Electrical System Service and Repairs Page 8 24 TIMECUTTER Service Manual 3433 938 Rev A ...
Page 215: ... Drawing Rev A Sheet 1 3433 938 Rev A Page A 3 Electrical Schematic g316875 ...