COMMANDER XT1000 / XT2000
User Manual
Rev 1.06
43 |
P a g e
5.
The Data screen shows the information received for a particular tightening sequence.
The pass and bolt number are displayed on top. Additional data such as the date and
time of the tightening are recorded as is the temperature of the pump fluid. The
target pressure, maximum pressure and the current pressure are displayed. The
maximum pressure for each bolt is displayed in the resulting graphs.
Tap
DONE
when the tightening sequence is complete.
6.
The Collection screen will highlight the next bolt to be tightened. The
current bolt is highlighted in
RED
and the completed bolts are highlighted
in
GREEN
.
Tap START to begin the next bolting sequence.
Tap SKIP to move to skip this bolt and move to the next bolt in the sequence.
Continue, repeating steps 4-5, until all bolts are tightened for each pass.