COMMANDER XT1000 / XT2000
User Manual
Rev 1.06
47 |
P a g e
ADDING A CHECK PASS
1.
After the required passes are complete, the COMMANDER XT1000 will ask if you
would like to perform a check pass. Tap either YES to perform a check pass or NO to
complete and close the tightening job.
2.
Tap the SELECT SEQUENCE TYPE block to select a sequence from the drop down menu
and tap
NEXT
. The default is CIRCLE based on ASME PCC-1 2013.
The program will walk you through an additional pass according to the previous
section. When that pass is completed, it will again ask if you will like to perform a check
pass. It will continue this until
NO
is selected.