TOSHIBA
9
2.0 Uncrating/Inspection/Storage/Disposal
2.1
Uncrating the new UPS equipment:
Upon receipt of the UPS, a careful inspection for shipping damage should be made.
1) Remove the screws that attach the
shipping crate to the pallet; remove the
crate and foam packing material.
2) Unbolt the rails from both the unit and the shipping
pallet. Place the rails on the front of the pallet as
shown in figure 2.2 and figure 2.3. Use the four
1/2x3" bolts used to secure the rails to the shipping
pallet to attach the rails as shown to the front of the
pallet.
3) Place the tie brackets as shown in
figure 2.3 in the slots at the lower
end of the ramps. SLOWLY roll the
unit down the ramp.