5.1
4200 Series Specifications 75 and 100kVA @ Standard 208Vac Output
Model Number
U42B3F750C6CB
U42B3F10KC6CB
Rated Output Capacity
75kVA
100kVA
External Dimensions
0
0
Rated Voltage
208V/120V
Voltage Variation
+10% to –15% ; (-15% to –30%) ****
Rated Frequency
50/60 Hz
Number Phases / Wires
3 Phases ; 4 Wire + GND
* Power Factor
Greater than .98 when in inverter mode
Required Input KW
75
100
Walk-in Function
From 20% to 100% over 5 seconds
Inrush Current
Less than 12 times rated current under synchronous operation
Current Limit
115% maximum
Input
* Harmonic Currents
Less than 3% THD
DC Nominal (Voltage Range)
240VDC (210 to 276VDC)
324VDC (284 to 374VDC)
Float Charge (Regulation)
274VDC (
±
2%) 2.28V/cell
370VDC (
±
2%) 2.28V/cell
Ripple Voltage
2% R.M.S.
**Rated Back-up Time
Refer to Battery System Manual
Battery
Rated Charge Current
20.0 Amps
Rated Voltage
208 / 120 VAC
Rated Current
208.3 Amps
277.8 Amps
Rated Power Factor
.8 lagging
Number Phases / Wires
3-phase 4 Wire + GND
Voltage Regulation (phase-phase)
±
2% (0-100% balanced load);
±
3% (0-100% unbalanced load)
Voltage Adjustment Range
±
5V Manually from front key pad
Phase Displacement
±
2
°
(0-100% balanced load);
±
4
°
(unbalanced load)
Rated Frequency
50 / 60 Hz
Frequency Regulation
±
0.1% in free running mode
Frequency Synchronous
±
.5/1.0/1.5 Hz (
±
1.0 Hz. std.) switch selectable by qualified technician
Frequency Slew Rate
1 Hz/s to 3Hz/s
Voltage Transients
(Recovery time: 50 msec.)
±
5% (100% load step change);
±
3% (loss or return of input voltage);
±
8% (transfer of bypass to inverter)
Inverter Overload Capacity
125% 30 sec ; 150% 5sec
Bypass Overload Capacity
1000% 10msec; 125% 10 min.
Crest Factor
2.5
Neutral Line Conductor
1.73 times line rating
Harmonic Voltage Distortion
1.5% max (linear load)
Output
Inrush Current protection
Automatic transfer to bypass, then retransfer to inverter
Efficiency
ac/dc/ac: 90% ; dc/ac: 92%
Heat loss to be removed
22178 Btu/hr (5586kcal/hr)
27296 Btu/hr (6879 kcal/hr)
Audible Noise
75db (A) at 1 meter from the units front display
Operating Temperature
0
°
-40
°
C; optimal temperature is 25
°
C
Operating Humidity
Less than 90% RH (no condensation)
Environment
Altitude ***
Less than 1000 meters
Items marked with an (*) are specified at rated conditions under balanced linear loads.
(**) Battery backup time may vary depending on the operating conditions and ambient temperature at the installation site, and an initial
charge time of 24 hrs is necessary to obtain proper battery performance level before the unit is placed in operation.
(***) At 6600-ft (2000 m) above sea level, output capacity should be derated by 3%. (Consult Factory for higher elevations)
(****) Prolonged operation at this level requires some deration of output capacity.