6.1.4
Power Connection Cable Routing and Conduit Placement 15/25/30 kVA
The following illustrates the proper cable routing that should be followed during the power
connection process of the 15/25/30 kVA.
Figure 6-3 15030kVA Cable Routing
CONDUIT
MOUNTING
PANEL
INPUT
CONDUIT
OUTPUT
CONDUIT
BATTERY
CONDUIT
Note:
1) Input and Output conductors
shall be installed in separate
conduits, and installed in
accordance with the latest
edition of NEC and the Local
Authority having jurisdiction.
2) Battery conductors shall be
installed in a separate conduit
and be of low resistance type.
Summary of Contents for 4200FA Series
Page 2: ...4200FA Installation and Operation Manual ...
Page 12: ...vi 4200FA Installation and Operation Manual ...
Page 16: ...4 4200FA Installation and Operation Manual NOTE This Label for Battery Units Only ...
Page 110: ...98 4200FA Installation and Operation Manual 36 3 in 922 mm ...
Page 115: ...4200FA Installation and Operation Manual 103 APPENDIX A Seismic Anchorages ...
Page 116: ...104 4200FA Installation and Operation Manual ...
Page 117: ...4200FA Installation and Operation Manual 105 ...
Page 118: ...106 4200FA Installation and Operation Manual ...
Page 136: ...124 4200FA Installation and Operation Manual ...
Page 137: ......