4200FA Installation and Operation Manual
31
6.3.2
Power Cable Routing and Conduit Placement 50 kVA
The following illustrates the proper cable routing that should be followed during the power connection
process for the 50kVA.
Note: Cabinet show with batteries, cabling is the same for units with internal batteries, internal
transformers, and neither internal batteries nor transformers.
Figure 6-7 50kVA Cable Routing and Terminal Location
Summary of Contents for 4200FA Series
Page 2: ...4200FA Installation and Operation Manual ...
Page 12: ...vi 4200FA Installation and Operation Manual ...
Page 16: ...4 4200FA Installation and Operation Manual NOTE This Label for Battery Units Only ...
Page 110: ...98 4200FA Installation and Operation Manual 36 3 in 922 mm ...
Page 115: ...4200FA Installation and Operation Manual 103 APPENDIX A Seismic Anchorages ...
Page 116: ...104 4200FA Installation and Operation Manual ...
Page 117: ...4200FA Installation and Operation Manual 105 ...
Page 118: ...106 4200FA Installation and Operation Manual ...
Page 136: ...124 4200FA Installation and Operation Manual ...
Page 137: ......