98
5-1 Trial operation
Preparation
Entering names
Checks before trial
operation (control
wiring)
Trial operation
startup
Item
Description
Preparation of necessary
documents
Entry of setting conditions
Checking installation work
Checking control wiring
using the before-trial
operation check list.
Checking block/tenant/area
names
Checking schedules
Power on
Initial screen
System initialization
Check point
●
Meeting with the customer on setting information
Creation of control wiring system diagram
Creation of air conditioner address table
Creation of schedule table for each R.C. group/indoor
●
Create a setting file including setting data.
●
Set the setting data in the Touch Screen Controller by
overwriting (copy) the data on its CF (Compact Flash) card.
●
Power supply wiring
●
Control wiring
●
Grounding of units
●
Check control wiring specifications and wire sizes.
●
Check block/tenant/area names using the air conditioner
address table.
●
Check schedules using the schedule table for each R.C.
group/indoor.
●
Turn on the Touch Screen Controller with the Intelligent
Server and the relay interface turned on.
●
The controller software starts automatically, and the total
building control screen appears.
●
Select “System Initialize” from the option to initialize the
system.
When “System Initialize” is selected, a message “Will you
re-cold start all intelligent server?” appears. Select “Yes”.
The setting file is transmitted from the Intelligent Server to
the relay interface.
The L1 or L2 LED of the Intelligent Server blinks during the
startup process. When the startup processing ends
successfully, the L1 and L2 LEDs turn off. If the startup
processing fails, the L1 LED lights up. Retry “System
Initialize” from the Touch Screen Controller in this case. Or
select “TPC-CON” on the hidden Windows task bar at the
bottom of the LCD screen. You can see a message on the
screen during the system reset. The “Access Start”
message appears at the end of several message lines. It
takes several minutes for system initialization.
Trial operation
Checking communication
status (referring to the
control wiring system
diagram)
Checking operation status
using the before-trial
operation check list.
●
Select air conditioning screen after System Initialize to check
communication status and connection of air conditioners.
Check that there is no orange frame on the command button
of the air conditioner, which indicates a communication
error. If an orange frame is present, check power on (or off),
control line wiring, and address setting of the air conditioner.
●
Check operation status for each block, tenant, area, and
R.C. group/indoor.
- ON/OFF
- Operation mode
- Set temperatures
Check all indoor units whether controls can be changed from
the Touch Screen Controller and whether the setting
changed by the remote controller is reflected on the Touch
Screen Controller on both the Touch Screen Controller side
and the on-site remote controller side.
Summary of Contents for BMS-TP0640ACE
Page 1: ...FILE NO A04 016 TCS NET AIR CONDITIONING CONTROL SYSTEM TOUCHSCREENCONTROLLER TENTATIVE ...
Page 16: ...16 ...
Page 17: ...17 2 SYSTEM CONFIGURATION 2 1 Touch screen controller system configuration ...
Page 22: ...22 ...
Page 54: ...54 ...
Page 96: ...96 ...
Page 103: ...103 ...
Page 104: ......