035-000051-001
Page 16 of 60
MMD IOM 1.2 11-10-2020
INSTALLATION-ELECTRIC HEAT
DANGER
WARNING: Hazardous voltage.
Only qualified
personnel must install the electrical service. Dis-
connect and Lock Out all incoming power sources
before connecting to electrical service.
Install Procedure:
To install the electric heater,
1. Disconnect and lock out electrical power from
the unit. Remove heater access panel. Discon-
nect field power wires from the unit power wires.
DANGER! - MAKE SURE there is no voltage
supply to the unit before proceeding!
2. Disconnect and discard 1 harness connector at
the blower deck.
3. Remove blank plate from heater access panel
(covers square hole for breaker style power
switches).
4. Remove SAT sensor and sensor holder from
heater bulkhead and reposition on unit discharge
ductwork routing through auxiliary SAT sensor
hole on top panel.
5. Install SAT 3 feet after the first 90 degree turn
in the discharge ductwork.
6. Remove plate on the heater bulkhead (4
screws).
7. Install heater by carefully supporting the heater
and inserting it into the opening in the heater bulk-
head. NOTE: Make sure to guide the pin into the
hole at the back of the heater shroud. Secure the
heater to the bulkhead with 4 screws.
8. Connect 2 wiring harnesses (male) to the
matching female receptacles in the blower deck.
9. Connect field wiring to the breaker-style power
Fig. 7 — Heater Accessory Removal
(right side and heater access panels
not shown for clarity)
switches on the front of the heater.
WARNING! Be
sure to provide the appropriate wire size and
branch circuit protection as required by the unit
nameplate!
10. Install the heater access panel.
11. Install the silicone cover “boot” over the top of
the power switches. This protects them from dust
buildup. The switches may be activated through the
flexible boot material.
12. Mark the nameplate label with the matching
heater kW rating. Label is located on the exterior of
the front top panel.
Fig. 8 — Heater
Accessory
Installed
PIN
HEATER
SHROUD
HEATER
ACCESS
PANEL
COVER
BOOT
HEATER
SHROUD
HEATER
ASSEMBLY
HEATER
BULKHEAD
POWER
SWITCH(ES)
Summary of Contents for Carrier MMD-AP0180VHG2UL
Page 2: ...035 000051 001 Page 2 of 60 MMD IOM 1 2 11 10 2020 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 4: ...035 000051 001 Page 4 of 60 MMD IOM 1 2 11 10 2020 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 6: ...035 000051 001 Page 6 of 60 MMD IOM 1 2 11 10 2020 PRODUCT NOMENCLATURE ...
Page 27: ...035 000051 001 Page 27 of 60 MMD IOM 1 2 11 10 2020 AIRFLOW PERFORMANCE ...
Page 31: ...035 000051 001 Page 31 of 60 MMD IOM 1 2 11 10 2020 SPECIAL FACTORY OPTIONS ...
Page 42: ...035 000051 001 Page 42 of 60 MMD IOM 1 2 11 10 2020 SPECIAL INSTRUCTIONS CONTROLS ...
Page 43: ...035 000051 001 Page 43 of 60 MMD IOM 1 2 11 10 2020 SPECIAL INSTRUCTIONS CONTROLS ...
Page 46: ...035 000051 001 Page 46 of 60 MMD IOM 1 2 11 10 2020 REPLACEMENT PARTS ...
Page 47: ...035 000051 001 Page 47 of 60 MMD IOM 1 2 11 10 2020 REPLACEMENT PARTS ...
Page 48: ...035 000051 001 Page 48 of 60 MMD IOM 1 2 11 10 2020 REPLACEMENT PARTS ...
Page 49: ...035 000051 001 Page 49 of 60 MMD IOM 1 2 11 10 2020 REPLACEMENT PARTS ...
Page 50: ...035 000051 001 Page 50 of 60 MMD IOM 1 2 11 10 2020 REPLACEMENT PARTS ...
Page 51: ...035 000051 001 Page 51 of 60 MMD IOM 1 2 11 10 2020 REPLACEMENT PARTS ...
Page 52: ...035 000051 001 Page 52 of 60 MMD IOM 1 2 11 10 2020 REPLACEMENT PARTS ...
Page 53: ...035 000051 001 Page 53 of 60 MMD IOM 1 2 11 10 2020 REPLACEMENT PARTS ...
Page 54: ...035 000051 001 Page 54 of 60 MMD IOM 1 2 11 10 2020 REPLACEMENT PARTS ...
Page 55: ...035 000051 001 Page 55 of 60 MMD IOM 1 2 11 10 2020 REPLACEMENT PARTS 19 ...
Page 56: ...035 000051 001 Page 56 of 60 MMD IOM 1 2 11 10 2020 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 58: ...035 000051 001 Page 58 of 60 MMD IOM 1 2 11 10 2020 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 59: ...035 000051 001 Page 59 of 60 MMD IOM 1 2 11 10 2020 THIS PAGE INTENTIONALLY LEFT BLANK ...