– 83 –
No.
c
Part name
Common
procedure
Procedure
CAUTION
Never forget to put on the gloves at working
time, otherwise an injury will be caused by the
parts, etc.
1. Detachment
1) Stop operation of the air conditioner, and turn
off the main switch of the breaker for air
conditioner.
2) Remove the valve cover. (M4, 8 mm, 3 pcs.)
• After removing screw, remove the valve
cover pulling it downward.
3) Remove connecting cable.
4) Remove the conduit mounting plate by taking
off 2 screws. (M4, 8 mm, 2 pcs.)
5) Remove the upper cabinet.
(M4, 8 mm, 5 pcs.)
• After taking off screws, remove the upper
cabinet pulling it upward.
6) Remove the waterproof cover.
2. Attachment
1) Attach the waterproof cover.
CAUTION
Be sure to attach a waterproof cover.
If it is not attached, there is a possibility that
water enters inside of the outdoor unit.
2) Attach the upper cabinet. (M4, 8 mm, 5 pcs.)
3) Attach the conduit mounting plate.
(M4, 8 mm, 2 pcs.)
4) Perform cabling of connecting cables.
5) Attach the valve cover. (M4, 8 mm, 3 pcs.)
• Insert the upper part of the upper cabinet,
set hooking claw of the valve cover to the
slit (at three positions) of the main body,
and then attach it pushing upward.
Remarks
11. DETACHMENTS
11-1. Outdoor Unit
11-1-1. RAV-SP180AT2-UL
Valve cover
Valve cover
Upper cabinet
Upper cabinet
Waterproof cover
Waterproof cover
Connecting cover
Connecting cover
Conduit mounting plate
Conduit mounting plate
Valve cover
Upper cabinet
Waterproof cover
Connecting cover
Conduit mounting plate
Summary of Contents for CARRIER RAV-SP180AT2-UL
Page 12: ... 12 2 CONSTRUCTION VIEWS EXTERNAL VIEWS 2 1 Outdoor Unit RAV SP180AT2 UL ...
Page 13: ... 13 RAV SP240AT2 UL ...
Page 14: ... 14 RAV SP300AT2 UL RAV SP360AT2 UL RAV SP420AT2 UL ...
Page 107: ... 107 12 EXPLODED VIEWS AND PARTS LIST 12 1 Outdoor Unit 12 1 1 RAV SP180AT2 UL ...
Page 110: ... 110 12 1 2 RAV SP240AT2 UL ...
Page 113: ... 113 12 1 3 RAV SP300AT2 UL RAV SP360AT2 UL RAV SP420AT2 UL ...