e-STUDIO182/212/242
© 2009 TOSHIBA TEC CORPORATION All rights reserved
GENERAL OPERATION
4 - 2
4.2
Description of Operation
4.2.1
Warming-up
1. Initialization
Power ON
→
Heater lamp ON
→
“Please wait” is displayed
→
Fan motors ON
→
Initialization of scanning system
- The CIS unit moves to the home position.
- The CIS unit moves to the peak detection position.
- The LED of CIS is turned ON.
- Peak detection (white color is detected by the shading correction plate)
- The LED of CIS is turned OFF.
- The CIS unit moves to the home position.
→
“READY (WARMING UP)” is displayed
2. Pre-running operation (Only when the temperature is at 16 °C or less)
The pre-running operation is started when the temperature of the fuser roller surface reaches a
certain temperature.
→
The main motor is turned ON
- Fuser roller rotated.
- Drum rotated.
→
Pre-running operation stops after 15 seconds
3. When the surface temperature of the fuser roller becomes sufficient for fusing,
→
“READY” is displayed
4.2.2
Ready state (ready for copying)
Buttons on the control panel enabled
→
When no button is pressed for a certain period of time,
- Set number “1” is displayed. Equipment returns to the normal ready state.
Summary of Contents for e-studio182
Page 12: ......
Page 18: ...e STUDIO182 212 242 2009 TOSHIBA TEC CORPORATION All rights reserved CONTENTS 6 ...
Page 76: ...e STUDIO182 212 242 2009 TOSHIBA TEC CORPORATION All rights reserved COPY PROCESS 3 14 ...
Page 120: ...e STUDIO182 212 242 2009 TOSHIBA TEC CORPORATION All rights reserved SCANNER 6 26 ...
Page 128: ...e STUDIO182 212 242 2009 TOSHIBA TEC CORPORATION All rights reserved LASER OPTICAL UNIT 7 8 ...
Page 228: ...e STUDIO182 212 242 2009 TOSHIBA TEC CORPORATION All rights reserved FUSER EXIT UNIT 12 24 ...
Page 257: ......
Page 258: ......