19
6
F
2
S
0
7
8
9
reference winding and set 0 (= noon) for it. For other star- or delta-connected winding(s), set
according to the Rule 1 mentioned above.
Example 1
If the setting winding leads the reference winding by 60
, set 2 (= two o’clock).
Example 2
If the setting winding is in phase with the reference winding, set 0 (= noon).
Example 3
If the setting winding lags the reference winding by 60
(that is leading by 300
),
set 10 (ten o’clock).
The settings for the two-winding transformer connections described in IEC60076-1 are listed in
Table 2.3.2.
Three-winding transformers are also set according to the above mentioned rules.
Example 4
Setting for star/star/delta transformer.
Setting (d1 / d2 / d3)
Primary (d1)
11
Secondary (d2)
11
Tertiary (d3)
0
(Note) The following calculation is performed in the relay for phase angle correction.
Setting
Calculation
Remarks
0
Ia = Ia
1
Ia = (Ia – Ic)/ 3
2
Ia =
Ic
3
Ia = (
Ic + Ib)/ 3
4
Ia = Ib
5
Ia = (Ib – Ia)/ 3
6
Ia =
Ia
7
Ia = (
Ia + Ic)/ 3
8
Ia = Ic
9
Ia = (Ic – Ib)/ 3
10
Ia =
Ib
11
Ia = (Ia – Ib)/ 3
Tertiary
Secondary
Primary
0
1
2
3
4
5
6
7
8
9
10
11
Ia
Setting value
Summary of Contents for GRT100 Series
Page 142: ... 141 6 F 2 S 0 7 8 9 Appendix A Block Diagram ...
Page 144: ... 143 6 F 2 S 0 7 8 9 Appendix B Signal List ...
Page 159: ... 158 6 F 2 S 0 7 8 9 ...
Page 160: ... 159 6 F 2 S 0 7 8 9 Appendix C Variable Timer List ...
Page 162: ... 161 6 F 2 S 0 7 8 9 Appendix D Binary Output Default Setting List ...
Page 165: ... 164 6 F 2 S 0 7 8 9 ...
Page 166: ... 165 6 F 2 S 0 7 8 9 Appendix E Details of Relay Menu and LCD and Button Operation ...
Page 174: ... 173 6 F 2 S 0 7 8 9 Appendix F Case Outline Flush Mount Type Rack Mount Type ...
Page 179: ... 178 6 F 2 S 0 7 8 9 ...
Page 180: ... 179 6 F 2 S 0 7 8 9 Appendix G External Connections ...
Page 185: ... 184 6 F 2 S 0 7 8 9 ...
Page 200: ... 199 6 F 2 S 0 7 8 9 ...
Page 201: ... 200 6 F 2 S 0 7 8 9 Appendix J Return Repair Form ...
Page 205: ... 204 6 F 2 S 0 7 8 9 Customer Name Company Name Address Telephone No Facsimile No Signature ...
Page 206: ... 205 6 F 2 S 0 7 8 9 ...
Page 207: ... 206 6 F 2 S 0 7 8 9 Appendix K Technical Data ...
Page 220: ... 219 6 F 2 S 0 7 8 9 ...
Page 221: ... 220 6 F 2 S 0 7 8 9 Appendix M Symbols Used in Scheme Logic ...
Page 224: ... 223 6 F 2 S 0 7 8 9 ...
Page 225: ... 224 6 F 2 S 0 7 8 9 Appendix N Implementation of Thermal Model to IEC60255 8 ...
Page 228: ... 227 6 F 2 S 0 7 8 9 ...
Page 229: ... 228 6 F 2 S 0 7 8 9 Appendix O IEC60870 5 103 Interoperability and Troubleshooting ...
Page 241: ... 240 6 F 2 S 0 7 8 9 Appendix P Modbus Interoperability ...
Page 255: ... 254 6 F 2 S 0 7 8 9 ...
Page 256: ... 255 6 F 2 S 0 7 8 9 Appendix Q Inverse Time Characteristics ...
Page 259: ... 258 6 F 2 S 0 7 8 9 ...
Page 260: ... 259 6 F 2 S 0 7 8 9 Appendix R Failed Module Tracing and Replacement ...
Page 266: ... 265 6 F 2 S 0 7 8 9 Appendix S Ordering ...
Page 269: ... 268 6 F 2 S 0 7 8 9 3 1 Oct 2 2017 Republished under spin off company ...
Page 270: ......