8. Calculating The Additional Gas Charge
Main Pipes
0.19 kg/m
Sub Pipes
0.125 kg/m
Branch Pipes
RAV-103 ; 0.030 kg/m
RAV-133 ; 0.030 kg/m
RAV-162 ; 0.030 kg/m
RAV-202 ; 0.030 kg/m
RAV-262 ; 0.045 kg/m
RAV-362 ; 0.045 kg/m
RAV-462 ; 0.045 kg/m
Single Multi Controller
Main pipe run (minus 3m.)
x
0.190 kg/m
=
Branch pipe A (minus 2m.)
x
see above kg/m
=
Branch pipe B (minus 2m.)
x
see above kg/m
=
Branch pipe C (minus 2m.)
x
see above kg/m
=
Branch pipe D (minus 2m.)
x
see above kg/m
=
Total Additional Gas Charge = _________________kg
Two Multi Controllers
Main pipe run (minus 2m.)
x
0.190 kg/m
=
Total sub pipe (minus 2m.)
x
0.125 kg/m
=
M/C1 Branch pipe A (minus 2m.)
x
see above kg/m
=
Branch pipe B (minus 2m.)
x
see above kg/m
=
Branch pipe C (minus 2m.)
x
see above kg/m
=
Branch pipe D (minus 2m.)
x
see above kg/m
=
M/C2 Branch pipe A (minus 2m.)
x
see above kg/m
=
Branch pipe B (minus 2m.)
x
see above kg/m
=
Branch pipe C (minus 2m.)
x
see above kg/m
=
Branch pipe D (minus 2m.)
x
see above kg/m
=
Total Additional Gas Charge = _________________kg
TOSHIBA
AUGUST 1997
Page 19