MBS (Wallmount) Installation - 64523-009

3

WARNING AREA

TEXT AREA

DANGER

Hazardous voltages are used in the operation
of this equipment and could cause severe personal
injury or loss of life.
The following precautions should be observed to
reduce the risk of injury or death.

HAZARDOUS VOLTAGES

Only qualified technicians familiar with this equipment and the
information supplied with it should be permitted to install and
operate this equipment.
Installation of electrical equipment must be done in
accordance with National Electrical Code and any other state
or local codes. Proper grounding and conductor sizing must
be installed for safe operation.

During operation, keep all covers in place and cabinet
doors shut.

When performing visual inspections and maintenance, if
possible, be sure the MBS is turned off and the incoming
AC feed is turned off and locked out.

If it is necessary to make measurements with the power
on, do not touch any electrical connection points. Remove
all jewelry from wrists and fingers. Make sure test equipment
is in good, safe operating condition.

While servicing, stand on some type of insulation, and be
sure not to be grounded.

Follow the safety instructions given in the equipment manual
carefully and observe all danger, warning and caution notices.

64818

MATERIAL - VINYL OR POLYESTER
TEMPERATURE - MINUS 20 TO 100 deg. C
ADHESIVE - V23 OR EQUIV.
MUST RESIST OIL SOLVENTS
ALL MATERIALS USED MUST
BE UL RECOGNIZED

WARNING AREA BACKGROUND COLOR: ANSI DANGER RED
WARNING AREA TEXT COLOR: ANSI WHITE
TEXT AREA BACKGROUND COLOR: ANSI WHITE
TEXT AREA TEXT COLOR: ANSI BLACK
CORNER RADIUS: VENDOR STANDARD

0.00

0.00

3.75

4.50

The UPS and Battery Cabinet will have hazardous
voltages present even after the AC feed is turned off.

THIS MATERIAL IS THE EXCLUSIVE PROPERTY OF TOSHIBA INTERNATIONAL
CORPORATION AND SHALL NOT BE REPRODUCED, USED, OR DISCLOSED
TO OTHERS UNLESS PRIOR WRITTEN AUTHORIZATION IS OBTAINED.

TITLE:

SCALE:

DRAWING NO.:

ECN

DATE

BY

DRAWN:

CHECKED:

APPROVED:

DANGER LABEL
GENERAL - MBS

64818

FULL

WLM 3-9-11

REV:

0

13131 WEST LITTLE YORK ROAD, HOUSTON, TX 77041 U.S.A.

WLM 3-10-11

ZIR 3-10-11

UNLESS

PRIOR

WRITTEN

AUTHORIZA

TION

IS
OBT

AINED.

THIS

MA

TERIAL

IS
THE

EXCLUSIVE

PROPER

TY

OF

BE

REPRODUCED,

U

SED

OR

DISCLOSED

T

O
OTHERS

T

O

SHIBA

INTERNA

TIONAL

CORPORA

TION

AND

SHALL

NOT

APPROVED

BY

DA
TE

CHECKED

BY

DRA

WN

BY

DA
TE

DA
TE

DRA

WING

NO.

13131

WEST

LITTLE

YORK

ROAD,

HOUST

ON,

TX,

77041

U.S.A.

TITLE

SCALE

OF

SH.

ORDER

NO.

64820

W

ALL

MOUNT

MBS

CONNECTION

LABEL

SHEET

1=1

11

DISK:

PR
T

REV

:

1

A

B

C

1/2” BOLT-SAE GRADE 8

TORQUE SPEC: 119 FT LB

ENSURE PROPER PHASING

LINE IN

USE COPPER CONDUCTORS ONLY!

REFER TO INSTRUCTION MANUAL FOR WIRE SIZE

A

B

C

1/2” BOLT-SAE GRADE 8

TORQUE SPEC: 119 FT LB

ENSURE PROPER PHASING

LOAD IN

USE COPPER CONDUCTORS ONLY!

REFER TO INSTRUCTION MANUAL FOR WIRE SIZE

A

B

C

1/2” BOLT-SAE GRADE 8

TORQUE SPEC: 119 FT LB

ENSURE PROPER PHASING

UPS IN

USE COPPER CONDUCTORS ONLY!

REFER TO INSTRUCTION MANUAL FOR WIRE SIZE

A

B

C

1/2” BOLT-SAE GRADE 8

TORQUE SPEC: 119 FT LB

ENSURE PROPER PHASING

UPS OUT

USE COPPER CONDUCTORS ONLY!

REFER TO INSTRUCTION MANUAL FOR WIRE SIZE

B1

CB2

NEUTRAL

SKRU

B1

1

2

T

C

4.50"

3.50"

1.75"

MA

TERIAL

-

POL

YESTER

TEMPERA

TURE

-

MINUS

20
T

O
100

deg.

C

ADHESIVE

-

V23

OR

EQUIV

.

MUST

RESIST

OIL

SOL

VENTS

ALL

MA

TERIALS

USED

MUST

BE

UL

&
RoHS

RECOGNIZED

TEXT

BACKGROUND:

ANSI

WHITE

OR

SIL

VER

TEXT

COLOR:

ANSI

BLACK

KISS

CUT

T

O
BORDER

LINES

6.00"

9.00"

1.75"

CB3

GND

INITIAL

RELEASE

04-1

1

ZIR

1.00"

1.50"

1.00"

WLM

4-24-13

3/8” BOLT-SAE GRADE 8

TORQUE SPEC: 47 FT LB

3/8” BOLT-SAE GRADE 8

TORQUE SPEC: 47 FT LB

3/8” BOLT-SAE GRADE 8

TORQUE SPEC: 47 FT LB

3/8” BOLT-SAE GRADE 8

TORQUE SPEC: 47 FT LB

ECO

86630

04-13

WLM

WLM

3-9-1

1

ZIR

4-24-13

IMPORTANT SAFETY INSTRUCTIONS

SAVE THESE INSTRUCTIONS

This manual contains important instructions that should be followed during the installation, maintenance, and operation of 

the MBS to assure safe and proper operation. 

1. 

Turn off, lockout, and tagout all power sources before connecting the power and SKRU wiring to the equipment or 

when performing maintenance.

2.  Verify the MBS is de-energized before removing the cabinet dead fronts.

3.  Verify cables and terminals are de-energized before installing cable in terminals. 

Qualified Personnel ONLY!

Qualified Personnel is one that has the skills and knowledge relating to the construction, installation, operation, and main

-

tenance of the electrical equipment and has received safety training on the hazards involved (Refer to the latest edition of 

NFPA 70E for additional safety requirements).

Qualified Personnel shall:

1.  Have read the entire operation manual.

2.  Be trained and authorized to safely energize, de-energize, ground, lockout and tag circuits and equipment, and 

clear faults in accordance with established safety practices.

3.  Be trained in the proper care and use of protective equipment such as safety shoes, rubber gloves, hard hats, 

safety glasses, face shields, flash clothing, etc., in accordance with established safety practices.

4. 

Be trained in rendering first aid.

5.  Be knowledgeable of batteries and the required handling and maintenance precautions.

For further information on workplace safety visit 

www.osha.gov

.

Summary of Contents for MBSWH-10K-F3-KK

Page 1: ...80 208 120V 300A 65 000 MBSWH 10K F3 KK 36 x 12 8 x 48 1 385 100 208 120V 400A 65 000 MBSWH 150 S3 KK 30 1 x 10 8 x 42 1 130 15 480V 40A 35 000 MBSWH 250 S3 KK 30 1 x 10 8 x 42 1 130 25 480V 40A 35 000 MBSWH 300 S3 KK 30 1 x 10 8 x 42 1 130 30 480V 50A 35 000 MBSWH 500 S3 KK 30 1 x 10 8 x 42 1 130 50 480V 100A 35 000 MBSWH 800 S3 KK 30 1 x 10 8 x 42 1 130 80 480V 125A 35 000 MBSWH 10K S3 KK 30 1 x...

Page 2: ...warn ing symbol is used to indicate high voltage locations and conditions that may cause serious injury or death if the proper precautions are not observed 2 Explosion warning The explosion warning symbol is an explosion image enclosed in a triangle The Explo sion warning symbol is used to indicate locations and conditions where molten exploding parts that may cause serious injury or death if the ...

Page 3: ...DE 8 TORQUE SPEC 119 FT LB ENSURE PROPER PHASING LINE IN USE COPPER CONDUCTORS ONLY REFER TO INSTRUCTION MANUAL FOR WIRE SIZE A B C 1 2 BOLT SAE GRADE 8 TORQUE SPEC 119 FT LB ENSURE PROPER PHASING LOAD IN USE COPPER CONDUCTORS ONLY REFER TO INSTRUCTION MANUAL FOR WIRE SIZE A B C 1 2 BOLT SAE GRADE 8 TORQUE SPEC 119 FT LB ENSURE PROPER PHASING UPS IN USE COPPER CONDUCTORS ONLY REFER TO INSTRUCTION ...

Page 4: ...alling this hasp are given in Appendix A POWER CABLING INSTRUCTIONS The MBS Circuit Breakers are equipped with terminal bus strips The terminal bus strips are pre drilled with standard 2 hole NEMA patterns to facilitate installation of power cables Medium Case 3 8 in bolt holes on 1 75 in centers Large Case 1 2 in bolt holes on 1 75 in centers Use of NEMA two hole cable terminations is recommended...

Page 5: ... Grey CLND 3 12 134 Long Barrel 1 2 in 1 75 in 3 White CLND 2 12 134 CSWD 2 12 134 Long Barrel Short Barrel 1 2 in 1 75 in 2 Brown CLND 1 12 134 Long Barrel 1 2 in 1 75 in 1 Green CLND 1 0 12 134 CSWD 1 0 12 134 Long Barrel Short Barrel 1 2 in 1 75 in 1 0 Pink CLND 2 0 12 134 CSWD 2 0 12 134 Long Barrel Short Barrel 1 2 in 1 75 in 2 0 Black CLND 3 0 12 134 Long Barrel 1 2 in 1 75 in 3 0 Orange CLN...

Page 6: ...the power cables as indicated below Verify phasing is correct before applying power LINE IN CB1 CB2 CB3 UPS IN LOAD IN UPS OUT Figure 1 MBS Power Cabling Connections Phase A B C Phase A B C Phase A B C Phase A B C NEUTRAL GND N N GND GND N N GND GND ...

Page 7: ...r SKRU UPS Bypass Enable TB End User Supplied Wiring 16 18 gage twisted pair MBS TB 1 1 2 V SKRU SKRU L MBSWH xxx F3 KS 120VAC MBSWH xxx S3 KS 24VDC Table 5 SKRU Point to Point Wiring From UPS Model Terminal Board To MBSWH Terminal Board 4200FA TB2 11 MBSWH TB1 1 4200FA TB2 12 MBSWH TB1 2 4300 TB3 1 MBSWH TB1 1 4300 TB3 2 MBSWH TB1 2 4400 TB3 1 MBSWH TB1 1 4400 TB3 2 MBSWH TB1 2 G8000 TB1 10 MBSWH...

Page 8: ...S Input Breaker 2 Turn UPS ON Verify UPS is in Bypass 3 Turn ON all UPS Battery DC breakers 4 Unlock CB3 5 Close CB3 UPS Output Breaker 6 Remove the key from CB3 and insert it in CB2 7 Open CB2 Maintenance Bypass Breaker 8 Lock CB2 9 Return UPS to Online Mode 3 Breaker MBS with SKRU Solenoid Key Release Unit Place MBS in Maintenance Bypass Mode 1 Transfer the UPS to static bypass Verify UPS is in ...

Page 9: ...MBS Wallmount Installation 64523 009 9 PARAMETERS 15 160kVA UNIT WEIGHT LBS KGS 130 58 9 VENTILATION REQTS NONE FINISH GRAY Figure 3 Dimensional Drawing for 0 200A MBSWH ...

Page 10: ...MBS Wallmount Installation 64523 009 10 PARAMETERS 80 500kVA UNIT WEIGHT LBS KGS 280 127 0 VENTILATION REQTS NONE FINISH GRAY Figure 4 Dimensional Drawing for 300A MBSWH ...

Page 11: ...rections until the 0 5 mm join separates 2 use the factory supplied hardware to mount the outer loop of the hasp on the MBS door The two mounting holed for the screws is located just aoe the door latch 3 Use the factory supplied hardware to mount the inner tongue of the hasp on the inner edge of the door frame The mounting holes are located just above the goor latch 4 After mounting both parts of ...

Page 12: ......

Page 13: ...POWER ELECTRONICS DIVISION 13131 West Little York Road Houston Texas 77041 9990 Tel 713 466 0277 Fax 713 466 8773 US 855 803 7087 Canada 800 872 2192 https www toshiba com tic industrial uninterruptible power systems Printed in the U S A ...

Reviews: