© 2005 - 2011 TOSHIBA TEC CORPORATION All rights reserved
MR-3018/3020/3021/3022
MAINTENANCE AND REWRITING ROM
7 - 1
7
7. MAINTENANCE AND REWRITING ROM
7.1
Periodic Maintenance
Fig. 7-1
Symbols used in the checklist
Preventive Maintenance Checklist
Note:
Note:
Page-Item (P-I) is described in the column of the Parts list.
Cleaning
Lubrication/Coating
Replacement
Operation check
A: Clean with alcohol
B: Clean with soft pad,
cloth or vacuum cleaner
L: Launa 40
SI: Silicon oil
W: White grease
(Molykote EM-30L)
AV:Alvania No.2
The number of sheets con-
sumed before replacement
(Value x 1,000).
R: Replace if deformed or
damaged
O: After cleaning or
replacement, confirm
there is no problem
Item to check
Cleaning
(30K)
Lubrica-
tion/
Coating
Replace-
ment
(x1,000)
Operation
check
Parts list
(P-I)
Remarks
1
Pickup roller
A
120
5-1
2
Separation roller
A
120
4-10
3
Feed roller
A
120
5-1
4
Registration roller
A
4-30
5
Intermediate transfer roller
A
3-13
6
Front read roller
A
3-14
7
Rear read roller
A
3-1
8
Reverse registration roller
A
3-10
9
Exit/reverse roller
A
4-25
10 Platen sheet
B or A
1-25
1
3
7
4
2
6
5
8
9
10
11/12
Summary of Contents for MR-3018
Page 4: ......
Page 90: ...MR 3018 3020 3021 3022 2005 2011 TOSHIBA TEC CORPORATION All rights reserved ADJUSTMENT 5 20 ...
Page 121: ......
Page 122: ......