DISASSEMBLY INSTRUCTIONS
(A)
Link Unit
Link Unit
(B)
Main Chassis
2-6: LINK UNIT (Refer to Fig. 2-6)
Set the Link Unit to the Eject position.
Remove the (A) side of the Link Unit first, then remove
the (B) side.
1.
2.
Fig. 2-6
2-7: LOADING MOTOR ASS'Y (Refer to Fig. 2-7)
Remove the Link Lever.
Remove the screw
1
.
Remove the Loading Motor Ass'y.
Unlock the 2 supports
2
and remove the Deck PCB
(BOT).
1.
2.
3.
4.
Main Chassis
2-9: TENSION ASS'Y (Refer to Fig. 2-9-A)
Move the Inclined S Ass'y to the back side.
Remove the Tension Spring.
Unlock the support
1
and remove the Tension Arm
Ass'y.
Remove the Tension Adjust.
Unlock the 2 supports
2
and remove the Tension Band
Ass'y.
Unlock the support
3
and remove the Tension Holder.
Remove the SS Brake Spring.
Remove the SS Arm Brake.
1.
2.
3.
4.
5.
6.
7.
8.
3
1
2
2
Tension Adjust
Tension Band Ass'y
Tension Spring
Tension Arm Ass'y
Tension Holder
Inclined S Ass'y
Fig. 2-9-A
SS Brake Spring
SS Arm Brake
NOTE
When you install the Tension Adjust, install as shown in
Fig. 2-9-B. (Refer to Fig. 2-9-B)
Fig. 2-9-B
2-10: T BRAKE ASS'Y (Refer to Fig. 2-10)
Remove the T Brake Spring.
Remove the T Brake Ass'y.
1.
2.
Adjust the direction of the Marker to inside.
T Brake Spring
T Brake Ass'y
Fig. 2-10
• Screw Torque: 5
±
0.5kgf•cm
Fig. 2-7
Main Chassis
Link Lever
Loading Motor Ass'y
1
2
Deck PCB
(BOT)
2-8: SENSOR COVER L3 (Refer to Fig. 2-8)
Unlock the support
1
and remove the Sensor Cover L3.
1.
Main Chassis
Sensor Cover L3
1
Fig. 2-8