No.
Replacement part name
Work procedure
Remarks
4
Control board assembly
1. Disconnect the leads and connectors
connected to the other parts from the control
board assembly.
1) Leads
•
3 leads (black, white, orange) connected
to terminal block.
•
Lead connected to compressor :
Disconnect the connector (3P).
•
Lead connected to reactor :
Disconnect the two connectors (2P).
2) Connectors (×8)
CN300 : Outdoor fan motor (3P: white)*
(* : See
Note
)
CN700 : PMV (6P: white)
CN603 : TS sensor (3P: white)*
CN601 : TD sensor (3P: white)*
CN602 : TO sensor (2P: white)
NOTE
These connectors have a disconnect
prevention mechanism: as such, the lock
on their housing must be released before
they are disconnected.
2. Remove the control board assembly from the
P.C. board base. (Remove the heat sink and
control board assembly while keeping them
screwed together.)
NOTE
Disengage the four claws of the P.C. board
base, hold the heat sink, and lift to remove it.
3. Remove the two fi xing screws used to secure
the heat sink and control board assembly.
4. Mount the new control board assembly.
NOTE
When mounting the new control board
assembly, ensure that the P.C. board is
inserted properly into the P.C. board
support groove.
P.C. board base
P.C. board
CN700
CN602
CN300
CN603
CN601
CN300 and CN603 are connectors
with locking mechanisms: as such, to
disconnect them, they must be pressed
in the direction of the arrow while pulling
them out.
FILE NO. SVM-15058
-1
- 11
2
-
Summary of Contents for RAS-18G2ACVP-T
Page 18: ...5 WIRING DIAGRAM FILE NO SVM 15058 18 ...
Page 122: ......