7-6-1. Defrost starting condition
A-Zone : If -10°C > Teo
≥ −
18°C, defrost will
start when.
Teo - Te
≥
2.5°C at teat 20 sec or
~ 30 min after operation.
B-Zone : If Te
≤ −
18°C, defrost start instantaneously
(Suddenly) 00 ~ 25 min ofter operation
C-Zone : If -2ºC
≥
Teo
≥ −
10°C defrost will start when
7-6-2. Defrost finish condition.
1) If Te
≥
3°C at least 60 sec -->4 way value on.
2) If Te
≥
8°C --> 4 way value on.
Timing
Fig. 7-6-2
Operation time (4 Loops = Tt)
Td1
Td2
FILE NO. SVM-06021
26
-
-
Teo - Te
≤ −
3°C at least 20 sec or ~ 60 min
after operation.
Td3 Td4
Finish time record
Start time record
Defrost time rate : (Td/Tt) x 100
Heating time rate : (Tt - Td) x Tt