,5
,:
-9
0;
+,
7;
73
*A
9<
*9
/<
;9
53
.9
:=
-0
56
+2
96
).
,,
3=
:2
:0
REFRIGERANT PIPING
Knockout of Pipe Cover
Knockout procedure
•
The indoor/outdoor connecting pipes can be connected in rear direction.
Take off the knockout part of the pipe cover through which pipes
•
Detach the pipe cover and tap on the knockout section a few times with
the shank of a screwdriver. A knockout hole can easily be punched.
•
After punching out the knockout hole, remove burrs from the hole and
then install the supplied protective bush and guard material around the
passage hole to protect wires and pipes.
Be sure to attach the pipe covers after pipes have been connected.
Cut the slits under the pipe covers to facilitate the installation.
After connecting the pipes,be sure to mount the pipe cover.
The pipe cover is easily mounted by cutting off the slit at the lower part of
the pipe cover.
Rear direction
* Be sure to wear heavy work gloves while working.
Supplied passage hole guard material
* Attach the guard material securely
so that it dose not come loose.
Supplied protective bush
Pipe cover
PLATE-TRANSPORTATION
•
Should be take off and
no need to fi x.
ES
FR
IT
VT
PL
CZ
RU
CR
HU
TR
NL
GR
SV
FI
VT
Summary of Contents for RAS-18PASG-T
Page 26: ...12 R410A R410A R32 R410A 5 R32 R410A R32 R410A ...
Page 27: ......
Page 28: ...1120650103 1 ...