1) Follow to the procedure in the item
2) Remove
3
screws and remove the ion-
Plasma-ion
charger, High
volt generator
charger assembly from the frame.
3) Remove the Plasma-ion charger
from the
High
volt generator assembly.
4) Remove cover of HV generator by unlock
4 claws.
5) Remove the board of HV generetor.
<Points to note during re-installation>
- Lay the wires straight, such that they pass
through the earth wire in a U-shape.
- Lay the wires such that the high voltage power
supply line passes in a U-shape.
No.
Part name
Work procedure
Remarks
7
5
Plasma-ion
4 Claws
U-shape groove
Ground lead
3
Screws
FILE NO. SVM-17050
- 110 -