No. Part name
Procedure
Remarks
⑧
PMV coil
⑨
Fan guard
1.Detachment
1) Perform works
①
and
②
.
2) Remove the front cabinet, and put it down so
that fan guard side directs downward.
3) Remove the hooking claws by pushing minus
screwdriver according to the arrow mark in the
right figure, and remove the fan guard.
2. Attachment
1) Insert claws of the fan guard in the holes of the
front cabinet. Push the hooking claws
(9 positions) by hands and fix the claws.
Perform work on a corrugated cardboard,
cloth, etc. to prevent flaw to the product.
All
the
attaching
works
have
completed.
Check
that
all
the
hooking
claws
are
fixed
to
the
specified
positions.
BODY-PMV
COIL-PMV
Rotate 180°
1.
Detachment
1)
Perform step 1 in 2 , all the steps in 3 and
1 in
4
.
2)
Turn the coil by 180 degrees then remove
by pull it upward.
1) Insert the coil at position which
perpendicular with pipe of PMV then turn
the coil
by 180 degrees
.
Make sure that lead wire of coil
is opposite with pipe of PMV
- 85 -