TGd: Blue
TGc: Green
TGb: Red
TGa: Yellow
Bundling band
Bundling band
Td sensor
Td sensor
Case thermo
Case thermo
Reactor lead
Reactor lead
Bundling band
Td sensor
Case thermo
Reactor lead
Detail G
No.
1
7
1
8
Part name
TG sensor
TGd: Blue
TGc: Green
TGb: Red
TGa: Yellow
Sensor wiring
process
Procedure
∗
Attachment
Mount these sensors on the directly arranged
part of the header connecting pipe at gas side
so that the cabinet turns toward the front side
and the sensors turn toward upper cabinet.
NOTE)
When mounting the sensors, check paint color
of the sensor lead tube part and the pipe color.
Mount the sensors to the position of same color.
• Using bundling band, bind PMV coil
(Blue to Yellow) with Tga to Tgd.
• For Td sensor, bind the case thermo and
reactor lead by bundling band.
NOTE)
Using the bundling band being on the market,
be sure to bind the position which was bound.
Remarks
NOTE)
At working time (finish time), be
sure not to damage the cover of
the sensor lead wire with edge of
sheet metal, etc.
If the cover of the sensor lead
wire is damaged, it is dangerous
because an electric shock or fire
may be caused.
NOTE)
After replacing of parts, check
the sensors are mounted at the
specified positions.
If there are incorrect mounted
positions, control of the product
does not operate correctly and a
trouble may be caused.
Pass TG sensor through the
upper side of connecting pipe of
PMV unit (Bl
ue
and then bin
d
it with lead wire of PMV coil.
Bunding ban
d
PMV coil (Bl
ue
to Yellow)
TGa to TGd sensors.
FILE NO. SVM-18052
- 105 -