Ensure that the shortest pipe length complies with the following:
L + b
≥
5 m
a
≥
b
CAUTION
When planning a layout for Units A and B, comply with the following:
1. The lengths after branching (“a” and “b”) should be equal if feasible. Install Units A and B
so that the difference of the branching lengths becomes less than 10 m if the lengths
cannot be equal due to the branch pipe position.
2. Install Units A and B on the same level. If Units A and B cannot be installed on the same
level, the difference in level should be limited to 0.5 m or less.
3. Be certain to install Units A and B in the same room. Units A and B cannot be operated
independently each other.
Pipe Length
(One Direction)
Full length (L + a or L + b)
Below 100 m
(actual length)
Branch piping (a, b)
Below 20 m
(actual length)
Difference of branch piping length
(b – a, or a – b)
Below 10 m
Height
Difference
Outdoor Unit -
Indoor Unit
(H)
Outdoor Unit Installed
Above Indoor Unit
Below 30 m
Outdoor Unit Installed
Below Indoor Unit
Below 30 m
Between Indoor Units (
Δ
h)
Below 0.5 m
Remarks : Total equivalent length 125 m or less