Replacement Procedures
4.11 Touch pad
Removing the touch pad
The following describes the procedure for removing the touch pad (See Figure 4-22).
1.
Peel off the
glass tape
and disconnect the
touch pad flat cable, finger print cable
from the connector on the touch pad.
2.
Remove the following
screws
securing the touch pad plate.
•
M2.0
×
3.0B
SUPER THIN HEAD screw
x6
3.
Remove the
touch pad board and touch pad plate
.
4.
Peel off and remove the
touch pad
from the cover assembly.
Figure 4-22 Removing the touch pad
Installing the touch pad
The following describes the procedure for installing the touch pad (See Figure 4-22).
1.
Peel off the separator covering on the sensor portion of a new touch pad.
4-38
Satellite U300 and Satellite Pro U300 Maintenance Manual (960-Q08)
Summary of Contents for Satellite Pro U300
Page 13: ...Satellite U300 and Satellite Pro U300 Maintenance Manual 960 Q08 13 ...
Page 14: ...Chapter 1 Hardware Overview ...
Page 48: ...2 1 CONFIDENTIAL Chapter 2 Troubleshooting Procedures ...
Page 49: ...2 2 CONFIDENTIAL Satellite U300 and Satellite Pro U300 Maintenance Manual 960 Q08 2 ...
Page 118: ...Test Program for Field Satellite U300 and Satellite Pro U300 Tests and Diagnostics Manual 17 ...
Page 172: ...Replacement Procedures 4 iiSatellite U300 and Satellite Pro U300 Maintenance Manual 960 Q08 ...
Page 228: ...Satellite U300 and Satellite Pro U300 Maintenance Manual 960 Q08 App i Appendices ...
Page 229: ...App ii Satellite U300 and Satellite Pro U300 Maintenance Manual 960 Q08 ...
Page 239: ...Handling the LCD Module A 6 Satellite U300 and Satellite Pro U300 Maintenance Manual 960 Q08 ...
Page 285: ...Display codes D 2 Satellite U300 and Satellite Pro U300 Maintenance Manual 960 Q08 ...
Page 307: ...Wiring Diagrams F 2 Satellite U300 and Satellite Pro U300 Maintenance Manual 960 Q08 ...
Page 311: ...Reliability I 2 Satellite U300 and Satellite Pro U300 Maintenance Manual 960 Q08 ...
Page 313: ...Reliability I 2 Satellite U300 and Satellite Pro U300 Maintenance Manual 960 Q08 ...