DK424i Installation
Step 5: Install Reserve Power
Strata DK I&M 6/00
7-31
DK424i Ins
tal
lation
Floor Mounting Three or More Cabinets
This section shows you how to mount three or more cabinets to a concrete, wood or computer
room floor. Use the General Steps for all of these methods first, then the specific steps that follow
for each method.
1. Make sure that cabinet power supplies (BPSU672A) are installed per
2. Remove front, side, and top covers from all cabinets (
Remove plastic locating parts from all cabinet back covers using Phillips screwdriver (
3. Install a floor fixture (BFIF) on each side of the bottom cabinet. (Make sure that the fixture is
inside of the cabinet edge. For Steps 3~10, see
4. Place cabinet two on top of the bottom cabinet and connect them together at points “A” and
“B” with the screws provided.
5. Place cabinet three on top of cabinet two and connect them together at points “A” and “B”
with the screws provided.
6. If installing more than three cabinets, install wall brackets (RWBF) on the top of cabinet three.
Position the three cabinets parallel to the wall (two inches from the wall) and secure the wall
brackets to the wall with customer-provided wood screws and wall anchors as required.
7. For systems with just three cabinets, secure the floor fixtures (already attached to the bottom
cabinet) to the floor with the customer-provided floor bolts.
8. Refer to the sub-sections that follow the appropriate procedure to anchor the system to
concrete, wood, or computer room floor.
9. Add remaining cabinets, making sure that the cabinets are connected together at points A and
B with the screws provided.
10. For systems with four or more cabinets, make sure that wall brackets (RWBF) are installed on
both sides of the top cabinet, in addition to cabinet three.
11. Check to make sure the cabinets are parallel to the wall. Secure the floor fixtures attached to
the bottom cabinet to the floor with the customer-provided floor anchors.
12. Connect the data cable of each Expansion Cabinet to the applicable data cable connector on
the Base Cabinet (
). (The data cable from the first Expansion Cabinet should be
connected to the connector labeled “CAB. 2”, the cable from the second Expansion Cabinet to
the “CAB. 3” connector, etc.)
13. Install ground wiring, AC and reserve power cabling, and PCB cabling per the
“Recommended Installation Sequence”
Fill out cabinet/slot identification labels on each cabinet and reinstall covers on the cabinets. (The
top cover should be installed on the top cabinet.)
Summary of Contents for Strata AirLink DK40i
Page 22: ...Introduction Related Documents Media xx Strata DK I M 6 00 ...
Page 48: ...DK14 Installation DK14 Wiring Diagrams 1 26 Strata DK I M 6 00 ...
Page 220: ...DK424 Installation Remote Cabinet Installation Instructions 5 68 Strata DK I M 6 00 ...
Page 262: ...DK424i Configuration Primary Reserve Power Cabinet Hardware 6 42 Strata DK I M 6 00 ...
Page 450: ...Universal Slot PCB Wiring Option Interface PCB Wiring Diagrams 10 42 Strata DK I M 6 00 ...
Page 592: ...Peripheral Installation Enhanced 911 Service E911 12 84 Strata DK I M 6 00 ...
Page 616: ...ACD Installation Spectrum Electronic Wall Boards 13 24 Strata DK I M 6 00 ...
Page 634: ...Fault Finding Fault Isolation Flowcharts 14 18 Strata DK I M 6 00 ...
Page 704: ...ISDN Interfaces ISDN Disconnect Cause Code 16 54 Strata DK I M 6 00 ...