Toshiba Rack Enclosure Installation Manual – 99881-000
13
12
Installing Cage Nut
*The hardware kit that comes with the enclosure includes the cage nut to use with square holes.
*Your equipment may also come with mounting hardware. Refer to your equipment’s manual for mounting
instructions before installing the equipment.
Note: Install cage nuts horizontally, with the ears engaging the sides of the square hole.
Do not install cage nuts vertically with the ears engaging the top and bottom of the
square hole.
Note
:
Install the cage nuts on the interior of the vertical mounting rail.
1)
From the inside of the mounting rail, insert the cage nut into the square hole by
hooking one ear of the cage nut assembly. Press it against the side of the square hole.
2)
Compress the cage nut at the sides slightly to allow the other ear of the cage nut to fit through the
square hole. When the cage nut is installed properly, both ears will stick out through the square hole
and be visible on the outside of the vertical mounting rail.
3)
After installing the cage nuts, use the included mounting screws and cup washers to secure the
equipment to the mounting rail. Insert the cup washers between the screws and the equipment’s
mounting bracket.
To Remove
:
remove any attached screw.
Grasp the cage nut and squeeze the sides to release it from the square hole.
Note: You may wish to use a cage nut tool (user-supplied) to help with cage nut installation and removal.