4-10
Toshiba
Disassembly and Reassembly
1-2-10 Gear Loading Drive, Slider Cam,
Lever Load S, T Ass’y Assembly
1) When reinstalling, be sure to align dot of Lever
Load T Ass'y
Œ
with dot of Lever Load S Ass'y
´
as shown in drawing, (Refer to Timing Point 1).
2) Insert the Pin A,B,C,D into the Slider Cam
ˇ
hole,
3) Be sure to align dot of Lever Load T
Œ
and dot of
Gear Loading Drive
¨
, (Refer to Timing Point 2).
4) Aline dot of Gear Loading drive
¨
with mark of
Slider Cam
ˇ
as shown in drawing(Refer to
Timing Point 3).
´
LEVER LOAD S
Œ
LEVER LOAD T
LEVER LOAD S
LEVER LOAD T
PIN A
PIN C
PIN B
PIN D
ˇ
SLIDER CAM
TIMING POINT 2
TIMING POINT 1
TIMING POINT 3
Fig. 4-19 Gear Loading Drive, Slider Cam,
Lever Load S, T Ass’y Assembly
1-2-9 Gear Loading Drive, Slider Cam,
Lever Load S, T Ass’y Removal
1) Remove the Belt Pulley. (Refer to Fig. 4-35)
2) Remove the Gear Loading Drive
Œ
after releasing
Hook [A] in the direction arrow as shown in detail
drawing.
3) Remove the Slider Cam
´
.
4) Remove the Lever Load
ˇ
, Link Load
ˆ
& Lever
Load
¨
, Link Load
Ø
.
Œ
GEAR LOADING DRIVE
ˆ
LINK LOAD S
ˇ
LEVER LOAD S
¨
LEVER LOAD T
Ø
LINK LOAD T
´
SLIDE CAM
HOOK(A)
Fig. 4-18 Gear Loading Drive, Slider Cam,
Lever T, S Load Ass’y Removal