Installation and Connections
W7B ASD Installation & Operation Manual
Startup and Test
Perform the following checks before turning on the
ASD:
• L1/R, L2/S, and L3/T are connected to the 3-
phase input power.
• T1/U, T2/V, and T3/W are connected to the
motor.
• The 3-phase input voltage is within the
specified tolerance.
• There are no shorts and all grounds are
secured.
Use the following table to record any changed
parameters for future reference.
Table 6. ASD Parameter Changes by Installer/Maintenance Personnel.
DANGER
ASD ID__________Name:______________________Date:_______
Notes
Parameter
Number
Parameter Name
Default or
Previous Setting
New Setting
Unit of
Measure
Note: Settings may also be recorded via Program
Utilities
Type Reset
Save User
Settings.
Summary of Contents for W7 DN-57442-006
Page 1: ...ADJUSTABLE SPEED DRIVES W7 DN 57442 006 INSTALLATION OPERATION MANUAL June 2020 ...
Page 2: ......
Page 3: ...Document Number 57442 006 Date June 2020 W7 ASD Installation and Operation Manual ...
Page 4: ......
Page 60: ......
Page 221: ......