XSDC 601-01
5.4 Space needed for maintenance
When installing the refrigerator cabinet,
enough space must be left around it for
maintenance operations (FIG. 4).
6. Operation
6.1
Preliminary
inspection
operations
Wait
the
necessary
time
for
the
equipment to reach the set temperature
before storing food inside of it. Do not
put hot foods or beverages inside the
refrigerator.
Store the products inside the perimeter
defined by the grills in order to prevent
blocking the flow of air. Do not obstruct
the fan intake area.
Do not obstruct the upper part of the
refrigerator or the air intakes when the
refrigerator cabinet is in operation or
under electrical power.
6.2 Start up
At the first startup, make sure the
refrigerator cabinet was transported only in a vertical position: otherwise wait 8 hours from the
time it was positioned before proceeding with start-up. Turn on the equipment by pressing the
general switch to “I” (FIG. 5, POS. 6).
6.3 Shut-down
To shut down the refrigerated cabinet, just press the main switch to the “0” position (FIG. 5, POS. 6);
the light on the switch will shut off.
To isolate the refrigerator from electrical power, remove the plug from the outlet.