Installing the bathtub for PPY1780PT
1.To confirm the drainage hole position.
Preparation prior to the installation of bathtub
①、
Ensure the floor is level for placing bathtub.
If the floor is not level, pedestals can be built for placing bathtub. Location depends on the position of bathtub
feet and height depends on the drainage fittings used.
②、
Detailed dimensions of drain hole depend on the dimensions of drain parts in drainage fittings.
Note: 1. After bathtub is placed, level the bathtub to ensure stable placement.
2. For detailed position of feet, refer to the dimension drawing on page 7.
Leave a 1/8”(3mm) gap between the flange and the framing.
Pedestal for vertical foot
Bathtub
dimension
Drain hole
1
1/8”(3mm)
2
16
Summary of Contents for PJY1724PW
Page 7: ...7 Dimension drawings PJY1724PW PPY1780PT ...
Page 8: ...Installation procedures for PJY1724PW 8 P 7 P 10 P 10 P 11 P 12 P 11 ...
Page 9: ...Installation procedures for PPY1780PT 9 P 18 P 18 3 16 5mm 13 16 20mm P 7 P 16 P 19 ...
Page 10: ...Installing the bathtub for PJY1724PW 2 1 B 20 B 10 2 3 4 10 ...
Page 11: ...5 1 2 A 5 B 10 B 6 6 11 ...
Page 12: ...Conduct a fill water 8 1 12 ...
Page 13: ...9 8 Fix the bathtub A 6 B 4 B 2 M12 A 2 3 2 2 1 13 3 16 5 mm 3 16 5 mm ...
Page 15: ...B 5 11 WARNING that does not contain alcohol Finishing 15 ...
Page 18: ...18 ...
Page 21: ...MEMO ...
Page 22: ...MEMO ...
Page 23: ...MEMO ...
Page 24: ... TOTO Ltd All rights reserved 2018 12 Printed in China NTE225 ...