24
Activating the Jukebox
Activation Procedure
In general, activation of your jukebox involves the steps listed in this section. Step-by-step
procedures are elaborated on in the rest of the document.
1. Power on the jukebox.
2. Proceed through the installation screens:
Power on the Jukebox
1. Power on the Modular Jukebox System (MJS) by pressing the On/Off switch on the connector
panel of the MJS unit.
The STBY light (standby) turns on in the control board to indicate that the jukebox can be
turned on.
2. Power on the jukebox by pressing the Power On button on the control board.
The Jukebox Software initialization screen appears indicating that the jukebox is starting the
installation process.
Jukebox Software Initialization Screen
Configure the Jukebox
After the jukebox has initialized, the Calibration screen appears.
WARNING:
During the following procedures, there may be periods during which
the jukebox appears not to be responding.
Booting the system with the new Gen 3 hard drive may take up to ten (10) minutes,
and the screen may be blank for up to 90 seconds during the installation procedure.
It is extremely important that you do not power down or attempt to reboot the
jukebox during this procedure, or you will risk corrupting and rendering the
hard drive unusable.
Summary of Contents for Gem3 Ovation
Page 1: ......
Page 42: ...36 Activating the Jukebox...