3
Preparing for Jukebox Installation
This chapter explains how to prepare to install a TouchTunes jukebox for a
location, including setting up communications connections and unpacking
the jukebox.
Unpacking and Checking Jukebox Components
A TouchTunes jukebox is delivered in several boxes, including boxes for the jukebox hardware
components and a parts kit. The following table shows the dimensions and weight of the
Ovation jukebox:
Before you install the jukebox, you must ensure that you have received all jukebox hardware
components and that both hardware components and the items in parts kit are in good
condition.
To check that you have all jukebox components:
1. Verify that you have received the following hardware components for the Ovation jukebox:
Height
Width
Depth
Weight
Crated
41”
32”
18”
142 lbs.
Uncrated
37 1/4”
27 1/4”
11 1/4”
125 lbs.
Component
Quantity
Component
Description
1
Ovation Digital Jukebox
1
Ovation wall bracket
1
Power cord
1
Parts kit
Summary of Contents for Gem3 Ovation
Page 1: ......
Page 42: ...36 Activating the Jukebox...