background image

         

I NSTALLATIO N  AND  SE TUP

:

1. Select a convenient location in your shop or commercial space to localize charging for your battery power 
equipment (120V/ 20A max load demand for each of your items needing charging). For every 8 items to be 
charged ensure you have (1) PDM-20 unit and (2) a 15/20R outlet. 

2. Connect unit to power, plugging in the NEMA 5-20P/C19 power cord to the input connector (see below)
 
3. Watch for operational LEDs to light up once 1-8 on the front panel to complete their initiation sequence to 
demonstrate operational unit status. 

4. Once complete, start plugging in charge units to the output receptacles 1-8 on the reverse face as needed. 

5. The software controls within the unit will automatically sweep available loads and determine the optimal 
configuration of open/closed outlets to keep total demand under 16A. As units become fully charged the 
software will automatically re-balance the configuration of open and closed outlets to keep overall demand 
within the limit of the socket powering the unit. 

Power Distribution Manager, Back Panel

Receptacle for input 

power connection.

Indicated presence of potentially harmful 
electrical shock hazards. De-energize circuit and 
consult instruction prior to operation.

SAFETY: Board is UL Component certified under 
UL File E206903

• 

Switching and monitoring, 120-240Vac 50/
60Hz, 30A input

• 

120V/16A output per channel

• 

NWGQ: Information Technology Equipment 
Including Business Equipment

Plug in battery powered equipment for recharge to outlets 1 

– 8.

Protected under the following patents and patent pending: 20040064198,20040064198, 7550870, 7630186,7672104 

210 Curtner Ave. Unit 6 

Campbell, CA 95008 

phone: 650-204-0019 

info@towatools.com 

Remote connectivity & interface available.

Contact us for details

Reviews: