4
TC36.NG06C 050411-16
PILOT SUPPLY
TUBE
MAIN GAS SUPPLY
TUBE
Fig. # 5
5.
Attach the pilot and gas supply tubes to
the bulk head fi tting and tighten.
(Fig. # 4) Ensure the connections are
gas tight. Conceal the spark and
sensor wires below the supply tubes.
A panel set must now be installed. See
Installation and Operating Instructions
manual for details.
6. Position the slots of the grate securing
brackets over the holes in the fl oor shield
and secure with the two screws
(Fig. # 5).
Fig. # 4