Figure 38: Band in natural gas position.
Hole in band
Figure 39: Band in liquid propane position.
19
TC36_NG04D 240317-24
5056.427D4
For complete valve conversion instructions, refer to the
instruction book included in the SIT conversion kit.
12. Slide the pilot adjustment band over and ensure that the hole in the orifice band is showing.
Figure 38 shows the pilot in the natural gas position. Figure 39 shows the pilot in propane gas
position.
13. On the gas conversion label (Figure 40) included in the conversion kit, fill in the date and the
name of the person who performed the conversion in the white area on the conversion label. Peel
off the protective backing and apply the conversion label directly onto the gas valve inside of the
gas valve control center (Figure 41).
14. Reattach the access cover, right hand enamel panel piece, burner tray, sand and rock set.
Figure 40: TC36_D Propane Conversion
Label.
Affix propane
conversion
label here
Figure 41: Propane conversion label location.