6
Town Food Service Equipment Company, Inc.
718/388-5650 outside New York State 800/221-5032
Ranges with optional Flue Risers have stainless steel extensions that cover the tops of the flue risers.
Locate the parts in the boxed marked
“
RANGE ACCESSORIES
”
.
1) Take assembled flue collar and turn with kink to rear (figure A).
2) Place flue collar on top of chimney extension as illustrated (figure B).
3) Catch front return beneath slot in backsplash (circled in figure C).
4) Snap kinked end into slot (figure D).
figure 1
figure 2
The optional field joint joins two or more ranges. It must be ordered when the ranges are built. It cannot be
added to existing ranges. A butt field joint has a standing seam between ranges while a splice field joint gives a
smooth fit.
Each range has a vertical seam at the joint between the ranges. The backsplashes will be joined.
1) Uncrate the ranges and install legs onto the gussets. Secure legs with the gusset set screw.
2) Carefully locate the battery into final location. Align the sides to be joined. The battery was assembled at the
factory to assure good fit. Pitched floors will add difficulty to battery assembly (figures 1 and 2).
3) Align the backsplashes. It may necessary to level the range so the backsplashes meet at top. Insert and slide
down the “U” shaped joiner until it is level with the top of the backsplash (figures 3 and 4).
figure C
figure d
figure B
figure a
kINk
FluE RISER ExTENSION INSTallaTION (NEW VERSION ON uNITS SHIPPEd aFTER JuNE 2005)
_________________________________________________________________________________
FIEld JOINT INSTallaTIONS
_________________________________________________________________________________
BuTT FIEld JOINT INSTallaTION INSTRuCTIONS
_________________________________________________________________________________